ABC Heavy Engineering Careers and Employment
About the company
The Main Workshops consist of a large high clearance fully integrated and comprehensively reticulated 9000m2 heavy industrial building complex with 15000m2 of outside concrete hardstand area an additional 15000m2 of hardstand storage area.
Ancillary structures such as Abrasive Blast and Paint Rooms, the Vehicle Maintenance Facility and the Administration Offices have a combined building area of 2000m2
The complex is fully integrated to provide maximum efficiencies including the movement...
The Main Workshops consist of a large high clearance fully integrated and comprehensively reticulated 9000m2 heavy industrial building complex with 15000m2 of outside concrete hardstand area an additional 15000m2 of hardstand storage area.
Ancillary structures such as Abrasive Blast and Paint Rooms, the Vehicle Maintenance Facility and the Administration Offices have a combined building area of 2000m2
The complex is fully integrated to provide maximum efficiencies including the movement of work between all seven major departments, all in one very large building with access for heavy dimensional loads up to 10mt wide, 10mt high and 35mt long.
Reviews
What would you say about your employer?
ABC Heavy Engineering locations
- Mackay QLD3.7 out of 5 stars.
- Companies
- ABC Heavy Engineering